HVAC design for hospitals, operation theatres, campuses and hotels

Design Collaborative’s HVAC design consultants work in the same studio as its architects and structural engineers. We design the air conditioning and ventilation of hospitals, medical colleges, campuses, hotels and halls so that the air is right where it must be, the building is comfortable where it should be, the running cost is known before the plant is bought, and the plant, ducts and shafts fit the building they were drawn for.

AS AN AWARD-WINNING ARCHITECTURAL PRACTICE, OUR TEAM OF EXPERTS UNDERSTANDS THAT A SUCCESSFUL PROJECT IS RELIANT UPON A PROACTIVE AND FLEXIBLE DESIGN TEAM.

AS AN AWARD-WINNING ARCHITECTURAL PRACTICE, OUR TEAM OF EXPERTS UNDERSTANDS THAT A SUCCESSFUL PROJECT IS RELIANT UPON A PROACTIVE AND FLEXIBLE DESIGN TEAM.

AS AN AWARD-WINNING ARCHITECTURAL PRACTICE, OUR TEAM OF EXPERTS UNDERSTANDS THAT A SUCCESSFUL PROJECT IS RELIANT UPON A PROACTIVE AND FLEXIBLE DESIGN TEAM.

AS AN AWARD-WINNING ARCHITECTURAL PRACTICE, OUR TEAM OF EXPERTS UNDERSTANDS THAT A SUCCESSFUL PROJECT IS RELIANT UPON A PROACTIVE AND FLEXIBLE DESIGN TEAM.

Hospital HVAC

 

A hospital is several buildings in one as far as air is concerned, and each part is designed to its own criteria.

Campuses, hotels and halls

Lecture halls and auditoriums are designed for full occupancy with the ventilation and the noise limits that acoustics require, because a hall nobody can hear in because of the air handling has failed twice. Hostels are designed for comfort and low running cost, usually with a mix of ventilation and room units. Hotel rooms, restaurants and banquet halls are designed around occupancy that swings from empty to full within an hour.

  • HAVC

Choosing the system

Chilled-water plant suits large, dense loads that run most of the day, such as a hospital’s clinical core or a banquet block. Variable refrigerant flow suits wards, hostels, offices and hotel rooms, where loads vary room by room. Split and packaged units suit small or remote areas. Ventilation alone, with the right orientation and openings, suits far more of an Indian building, in most of the country’s climates, than briefs assume, and it costs nothing to run. We set out the options for each part of your building with their capital cost, running cost, plant space and maintenance in one table, and we design around the choice you make.

  • DESIGN COLLABORATIBVE

Designed with the building

Plant rooms, air-handling rooms and shafts are in the plans from the concept stage, sized by us, not left as a question for later.
Duct depths are checked against beam depths and floor-to-floor heights before the structural grid is fixed.
Roof and basement plant loads are in the structural design.
Noise from plant and air handling is checked against wards and halls, with silencers and isolation designed in.
Stair and lift-lobby pressurisation is designed with the fire system by the same engineers.
The electrical load and the building management system points for the plant are in the electrical design from the start.
  • DESIGN COLLABORATIBVE

What you receive

Room-by-room heat-load calculations and design basis
Equipment selection and schedules, with the system comparison that led to them
Duct and pipe layouts, air-handling room and plant-room drawings
Pressure, air-change and filtration schedules for clinical areas
Specifications for tender and review of the contractor's shop drawings
Testing, balancing and commissioning checklist, and validation requirements for theatres

Standards

National Building Code of India 2016, Part 8; ISHRAE and ASHRAE guidance for healthcare ventilation; the Energy Conservation Building Code where it is notified; and the operation-theatre and critical-area requirements of NABH where the hospital seeks accreditation.

Why Design Collaborative

  • HVAC designed by the team that plans the hospital, so the decision of where not to air-condition is made with the architecture.
  • Operation theatres and critical areas designed to be validated, not just installed.
  • Plant, shafts and loads in the structural and electrical design from day one.

QUESTIONS

Questions about hospital and campus HVAC

What air changes and filtration do operation theatres need?
Operation theatres are designed to a minimum air-change rate with terminal high-efficiency filtration, positive pressure against the adjacent rooms and a controlled temperature and humidity band, as set out in the guidance that NABH-accredited hospitals follow. We design to those criteria and provide the schedule the validation agency will test against.
Should a hospital use chillers or VRF?
Usually both. A chilled-water plant suits the clinical core, where loads are large and constant; variable refrigerant flow suits wards and rooms, where loads vary. The split depends on the size of the hospital, its phasing and the plant space available, and we set out the comparison before you decide.
Can parts of a hospital be naturally ventilated?
Yes, and in most of India's climates they should be wherever the function allows. Wards, waiting areas, corridors, housing and hostels can be designed around orientation, cross-ventilation and shading. The Aravind Eye Hospital in Chennai was designed that way for most of its area. The clinical core is then the only part that needs full air conditioning.
Can you upgrade the HVAC of an existing operation theatre?
Yes. We survey the theatre, its air handling and the spaces around it, identify what prevents it meeting the criteria, and design the changes, usually a dedicated air-handling unit, filtration, pressure control and sealing of the room, in a way that can be built during a planned shutdown
What drives the running cost of a hospital's HVAC?
The area you choose to air-condition, the efficiency of the plant, how well the building keeps heat out, and how the system is controlled when parts of the hospital are empty. The first of these is decided by the architecture, which is why we design the two together.
 Find out what your departments need

Send us the department list and the plans. We will tell you which areas need what, which can be ventilated naturally, and the plant and shaft space to reserve.