Fire alarm and fire fighting system design for hospitals, campuses and hotels
Design Collaborative designs the detection, alarm and fire fighting systems of the buildings it designs and of other architects’ buildings. The systems are designed with the plan, the structure and the air conditioning rather than drawn over them, and the drawings and calculations are prepared in the form the fire authority needs for its no-objection certificate.
AS AN AWARD-WINNING ARCHITECTURAL PRACTICE, OUR TEAM OF EXPERTS UNDERSTANDS THAT A SUCCESSFUL PROJECT IS RELIANT UPON A PROACTIVE AND FLEXIBLE DESIGN TEAM.
AS AN AWARD-WINNING ARCHITECTURAL PRACTICE, OUR TEAM OF EXPERTS UNDERSTANDS THAT A SUCCESSFUL PROJECT IS RELIANT UPON A PROACTIVE AND FLEXIBLE DESIGN TEAM.
AS AN AWARD-WINNING ARCHITECTURAL PRACTICE, OUR TEAM OF EXPERTS UNDERSTANDS THAT A SUCCESSFUL PROJECT IS RELIANT UPON A PROACTIVE AND FLEXIBLE DESIGN TEAM.
AS AN AWARD-WINNING ARCHITECTURAL PRACTICE, OUR TEAM OF EXPERTS UNDERSTANDS THAT A SUCCESSFUL PROJECT IS RELIANT UPON A PROACTIVE AND FLEXIBLE DESIGN TEAM.
AS AN AWARD-WINNING ARCHITECTURAL PRACTICE, OUR TEAM OF EXPERTS UNDERSTANDS THAT A SUCCESSFUL PROJECT IS RELIANT UPON A PROACTIVE AND FLEXIBLE DESIGN TEAM.
AS AN AWARD-WINNING ARCHITECTURAL PRACTICE, OUR TEAM OF EXPERTS UNDERSTANDS THAT A SUCCESSFUL PROJECT IS RELIANT UPON A PROACTIVE AND FLEXIBLE DESIGN TEAM.
AS AN AWARD-WINNING ARCHITECTURAL PRACTICE, OUR TEAM OF EXPERTS UNDERSTANDS THAT A SUCCESSFUL PROJECT IS RELIANT UPON A PROACTIVE AND FLEXIBLE DESIGN TEAM.
AS AN AWARD-WINNING ARCHITECTURAL PRACTICE, OUR TEAM OF EXPERTS UNDERSTANDS THAT A SUCCESSFUL PROJECT IS RELIANT UPON A PROACTIVE AND FLEXIBLE DESIGN TEAM.
Systems we design
Hydrants and wet risers
Sprinklers
Fire pump room and water storage
Detection and alarm
Special suppression for electrical and data rooms
Portable extinguishers and signage
Fire safety in hospitals and campuses
A hospital is the hardest building to evacuate, because many of the people in it cannot use a stair. Hospital fire design therefore starts from horizontal evacuation: the floor is divided into compartments, and in a fire the patients are moved through fire doors into the next compartment on the same level rather than down and out. That sets the compartment sizes, the fire rating of the walls and doors, the width of corridors and the position of the refuge areas, and it has to be in the architectural plan before the fire engineer draws a pipe. Operation theatres, intensive care and imaging rooms need their own treatment: sprinkler omission or special heads, detection that does not trip on normal activity, and air-handling shutdown that does not leave a theatre at negative pressure. Medical gas and oxygen storage add their own separation and ventilation rules.
A campus brings different risks: hostels with hundreds of sleeping occupants, laboratories with flammable stores, auditoriums and convention halls with large crowds and single exits, and kitchens. Each is a different occupancy under the code and each gets its own system and escape design.
Approval drawings and the fire no-objection certificate
The fire authority issues a provisional no-objection certificate on drawings before construction and a final one after inspection. Our approval package contains the fire fighting layouts floor by floor, the schematic of the hydrant, sprinkler and pump arrangement, the hydraulic calculations, the tank and pump sizing, the pump-room drawing, the detection and alarm layouts, the escape and refuge plan and the design note. We submit it, answer the authority’s queries and revise the drawings until the certificate is issued, and we attend the final inspection.
FIRE ALARAM AND FIRE FIGHTINGS SYSTEMS
Coordination with structure, HVAC and architecture
Codes we design to
National Building Code of India 2016, Part 4; the Indian Standards for hydrants, sprinklers, detection and extinguishers; the state fire service rules under which the no-objection certificate is issued; and the fire safety requirements of NABH where the hospital seeks accreditation.
DESIGN COLLABORATIVE
What you receive

Why Design Collaborative
- Fire systems designed with the plan, the structure and the air conditioning, by one team.
- Hospitals and campuses since 2009: the occupancies the code treats most strictly.
- The approval package is part of the appointment, not an extra.
QUESTIONS
Questions about fire system design and approval
What drawings does a fire no-objection certificate need?
Do hospitals need sprinklers?
How are the fire tank and pumps sized?
Can you design fire systems for a building that already exists?
Can you act as fire consultant only?
Find out what your approval needs
Send us the plans and the occupancy. We will tell you what the fire approval needs for your building, and where the risers, tanks and pump room should go.