Civil and structural engineering design for hospitals, campuses and hotels

Design Collaborative’s structural design consultants design the structures of hospitals, medical colleges, campuses, hotels and halls in the same studio as the architects and the services engineers. The structure is sized for the building you will have in ten years, with the imaging equipment, the added floors and the long-span halls already allowed for, and it is coordinated with the ducts, the pipes and the plant before the tender set is drawn.

AS AN AWARD-WINNING ARCHITECTURAL PRACTICE, OUR TEAM OF EXPERTS UNDERSTANDS THAT A SUCCESSFUL PROJECT IS RELIANT UPON A PROACTIVE AND FLEXIBLE DESIGN TEAM.

AS AN AWARD-WINNING ARCHITECTURAL PRACTICE, OUR TEAM OF EXPERTS UNDERSTANDS THAT A SUCCESSFUL PROJECT IS RELIANT UPON A PROACTIVE AND FLEXIBLE DESIGN TEAM.

AS AN AWARD-WINNING ARCHITECTURAL PRACTICE, OUR TEAM OF EXPERTS UNDERSTANDS THAT A SUCCESSFUL PROJECT IS RELIANT UPON A PROACTIVE AND FLEXIBLE DESIGN TEAM.

AS AN AWARD-WINNING ARCHITECTURAL PRACTICE, OUR TEAM OF EXPERTS UNDERSTANDS THAT A SUCCESSFUL PROJECT IS RELIANT UPON A PROACTIVE AND FLEXIBLE DESIGN TEAM.

Structural safety, designed in

Structural safety is not a certificate at the end; it is a set of decisions at the start. The loads a hospital carries are heavier and more varied than an office’s: imaging equipment, operation-theatre installations, water tanks, plant and the crowds in its halls. Hospitals are treated by the Indian seismic code as important structures, and are designed to a higher level of earthquake resistance than an ordinary building, with the ductile detailing that lets them stand after a shock. Durability is designed in through concrete grades, cover and detailing suited to a coastal or humid site, and the fire resistance of the structure is coordinated with the fire design. On site, we inspect at the stages that matter, reinforcement before concreting and the formwork before it, so that what was designed is what gets built.

Structures for hospitals

Campuses, hostels and halls

 

Long-span halls without columns in the middle, such as the pillar-less 20,000 sq ft wedding hall at Suganya Convention Hall in Pondicherry, hostels of many floors with repetitive, economical framing, library blocks with their heavy floor loads, auditoriums with raked seating and stage structures, and the plinths, roads and compound structures that tie a campus together.

Civil engineering and site works

Site grading and surface drainage designed with the plumbing engineers, internal roads and parking, retaining structures on sloping sites, basements with their waterproofing and dewatering, and the interfaces with the water, sewage and power utilities at the boundary

• Civil and Structural Engineering

Appointment options

Full structural design with our architecture, as part of an integrated appointment.
Structural consultancy to another architect, designed to their drawings and programme.
Proof checking and structural audits of existing buildings, including before floors are added.

• Design Collaborative

What you receive

Design basis, with the loads, the seismic parameters and the expansion allowances
Analysis and design calculations
General arrangement and reinforcement drawings; fabrication drawings for steel
Specifications and bar bending schedules for tender
Structural stability certificate for the approval
Site inspection at agreed stages and review of the contractor's queries

Codes we design to

IS 456 for reinforced concrete, IS 800 for steel, IS 875 for loads, IS 1893 and IS 13920 for earthquake design and detailing, and National Building Code of India 2016, Part 6.

Why Design Collaborative

  • Structures designed in the same studio as the architecture and the services, with a signed coordination review before tender.
  • Hospital loads, vibration limits and expansion planned in, since 2009.
  • A G+8 hospital over two basements and a 20,000 sq ft pillar-less hall in the portfolio.

• Questions

Questions about structural design

Can floors be added to our hospital later?
Yes, if they were planned for. We design columns and foundations for the floors you expect to add and make the roof slab a future floor. For an existing building we assess the structure, confirm what it can carry, and design the strengthening if more is needed.
How are imaging and operation-theatre loads handled?
The equipment schedule goes into the structural design: point loads, vibration limits and shielding masses for MRI, CT and radiotherapy, and the ceiling structure for theatre pendants and lights. We design the floor and the supports for the equipment you are buying and leave margin for the next generation of it.
Do you provide structural stability certificates?
Yes. Our structural engineers design, check and sign the drawings and issue the stability certificate the building approval requires. Where the authority or the client asks for an independent proof check, we coordinate it and incorporate the comments.
Can you work with our architect?
Yes. We act as structural consultants to other architects on hospitals, campuses and hotels, designing to their drawings and programme and coordinating with their services consultants.
What do you need from us to start?
The architectural plans and sections, the soil investigation report if one exists, the equipment schedule for a hospital, and your expansion plans. If there is no soil report yet, we will specify the investigation you need.

Send us your plans

Send us the architectural plans and the soil report if you have one. We will tell you the structural system that suits the building and what to allow for expansion.