  • SERVICES/FIRE ALARAM AND FIRE FIGHTING SYSTEMS

Fire alarm and fire fighting system design for hospitals, campuses and hotels

Design Collaborative designs the detection, alarm and fire fighting systems of the buildings it designs and of other architects’ buildings. The systems are designed with the plan, the structure and the air conditioning rather than drawn over them, and the drawings and calculations are prepared in the form the fire authority needs for its no-objection certificate.

AS AN AWARD-WINNING ARCHITECTURAL PRACTICE, OUR TEAM OF EXPERTS UNDERSTANDS THAT A SUCCESSFUL PROJECT IS RELIANT UPON A PROACTIVE AND FLEXIBLE DESIGN TEAM.

AS AN AWARD-WINNING ARCHITECTURAL PRACTICE, OUR TEAM OF EXPERTS UNDERSTANDS THAT A SUCCESSFUL PROJECT IS RELIANT UPON A PROACTIVE AND FLEXIBLE DESIGN TEAM.

AS AN AWARD-WINNING ARCHITECTURAL PRACTICE, OUR TEAM OF EXPERTS UNDERSTANDS THAT A SUCCESSFUL PROJECT IS RELIANT UPON A PROACTIVE AND FLEXIBLE DESIGN TEAM.

AS AN AWARD-WINNING ARCHITECTURAL PRACTICE, OUR TEAM OF EXPERTS UNDERSTANDS THAT A SUCCESSFUL PROJECT IS RELIANT UPON A PROACTIVE AND FLEXIBLE DESIGN TEAM.

Systems we design

fire-system

Fire safety in hospitals and campuses

A hospital is the hardest building to evacuate, because many of the people in it cannot use a stair. Hospital fire design therefore starts from horizontal evacuation: the floor is divided into compartments, and in a fire the patients are moved through fire doors into the next compartment on the same level rather than down and out. That sets the compartment sizes, the fire rating of the walls and doors, the width of corridors and the position of the refuge areas, and it has to be in the architectural plan before the fire engineer draws a pipe. Operation theatres, intensive care and imaging rooms need their own treatment: sprinkler omission or special heads, detection that does not trip on normal activity, and air-handling shutdown that does not leave a theatre at negative pressure. Medical gas and oxygen storage add their own separation and ventilation rules.

A campus brings different risks: hostels with hundreds of sleeping occupants, laboratories with flammable stores, auditoriums and convention halls with large crowds and single exits, and kitchens. Each is a different occupancy under the code and each gets its own system and escape design.

Approval drawings and the fire no-objection certificate

The fire authority issues a provisional no-objection certificate on drawings before construction and a final one after inspection. Our approval package contains the fire fighting layouts floor by floor, the schematic of the hydrant, sprinkler and pump arrangement, the hydraulic calculations, the tank and pump sizing, the pump-room drawing, the detection and alarm layouts, the escape and refuge plan and the design note. We submit it, answer the authority’s queries and revise the drawings until the certificate is issued, and we attend the final inspection.

FIRE ALARAM AND FIRE FIGHTINGS SYSTEMS

Coordination with structure, HVAC and architecture

Shaft and riser positions are fixed in the plan with the architects, so the wet riser is in the stair and the sprinkler mains have a route.
Stair and lift-lobby pressurisation is designed by our HVAC engineers with the fire system, not by two consultants separately.
The tank and pump-room loads are in the structural design from the start.
Compartment lines, fire-rated walls and doors are drawn on the architectural plans, and the detection zones follow them.
The alarm interfaces to the air handling, the lifts, the access control and the building management system are on one schematic.

Codes we design to

National Building Code of India 2016, Part 4; the Indian Standards for hydrants, sprinklers, detection and extinguishers; the state fire service rules under which the no-objection certificate is issued; and the fire safety requirements of NABH where the hospital seeks accreditation.

DESIGN COLLABORATIVE

What you receive 

Design basis, occupancy classification and system selection
Fire fighting layouts, schematic and hydraulic calculations
Tank and pump sizing and the pump-room drawing
Detection and alarm layouts and interface schematic
Escape, compartmentation and refuge plan prepared with the architects
Equipment schedules and tender specifications
The approval package, submission and query handling
Review of the contractor's shop drawings and a testing and commissioning checklist

Why Design Collaborative

  1. Fire systems designed with the plan, the structure and the air conditioning, by one team.
  2. Hospitals and campuses since 2009: the occupancies the code treats most strictly.
  3. The approval package is part of the appointment, not an extra.

QUESTIONS

Questions about fire system design and approval
What drawings does a fire no-objection certificate need?
Floor-by-floor fire fighting layouts, a schematic of the hydrant, sprinkler and pump arrangement, hydraulic calculations, tank and pump sizing, the pump-room drawing, detection and alarm layouts, the escape and refuge plan and a design note, all signed by the designer. Requirements vary a little between states; we prepare the package to the format of the authority that will issue your certificate.
Do hospitals need sprinklers?
For most hospitals of any size the code requires sprinklers in the greater part of the building, with specific rooms treated differently. The exact requirement depends on height, built-up area and occupancy, which is why we classify the building first and then tell you system by system what applies.
How are the fire tank and pumps sized?
From the code's storage requirement for the building's occupancy and height, checked against the hydraulic calculation for the most demanding point in the system. The main and standby pumps, the jockey pump and the tank capacity follow from that calculation, and we size the pump room and its loads with the structural engineer.
Can you design fire systems for a building that already exists?
Yes. For an existing hospital or campus facing an audit, an expansion or a renewal of its certificate, we survey what is installed, identify what the code now requires, and design the additions and the approval package. Work can usually be phased so that the building stays open.
Can you act as fire consultant only?
Yes. Many of our fire appointments are alongside another architect or within a PMC-led team. We design to their drawings and programme, coordinate with their structural and HVAC consultants, and take the approval through to the certificate.

Find out what your approval needs

Send us the plans and the occupancy. We will tell you what the fire approval needs for your building, and where the risers, tanks and pump room should go.